Bottom Section OLD

How It Works

STEP:1
Small 5/8 inch holes are drilled through the sunken slab.
STEP:2
An injector port is carefully installed in each of the holes.
STEP:3
High-density foam is injected into the port, where it expands & lifts the slab.
STEP:4
With the port removed, the holes are cleaned & patched with cement.

Before & Afters

Contact Us To Schedule a Free Estimate



    Phone:

    - -